ID MARBLEPOXY

Process

Eight steps. Zero shortcuts.

The durability of an epoxy floor starts with preparation. That's why we never skip a step.

Average time: 3 to 5 days
  1. 01

    Assessment

    On-site visit, measurement, and moisture reading of the subfloor.

  2. 02

    Preparation

    Diamond grinding that opens the pores and ensures total adhesion.

  3. 03

    Floor repair

    Cracks, holes, and uneven spots restored with epoxy mortar.

  4. 04

    Primer

    A bonding layer that seals the concrete and prevents bubbling.

  5. 05

    Application

    Self-leveling resin applied at a precisely controlled thickness.

  6. 06

    Finish

    Movement, pigments, and effects hand-crafted, one at a time.

  7. 07

    Curing

    A controlled, isolated environment throughout the resin's cure.

  8. 08

    Handover

    Final cleanup, joint walkthrough, and care manual.

Luxury garage with mirror-finish metallic epoxy floor

Free Quote

Your next floor starts here.

Request a free quote and discover how to transform your space with a premium finish.

Chat on WhatsApp